wingkam@126.com +86-13923418427
翻译
中文(简体)
» 工程 & 过程

工程 & 过程

 

Process Designed: Low pressure die casting+Low pressure sand casting
Pouring will be automatic,replace manual.Aluminum can go to mold in stable and even condition,this can avoid tumbling and no oxidized slag.Pouring with pressure,the shrink will also be avoided.
Stop the risk from manual pouring acident.Pouring in automatic will increase the production efficiency.
Sand casting: We started sand casting from 2003. Now we have two manufacture site for sand casting. The total molding area is 2200 square meters. Monthly capacity is 50 tons casting. Sand casting can make bronze. Aluminum and stainless
失蜡熔模铸造: We started lost wax investment casting from 2012. Now we have two manufacture sites with investment casting process. Monthly capacity is 30 tons for bronze casting. Lost wax can make bronze, 不锈钢 & special alloys.
重力压铸: We started gravity die casting from 2021. Now we have two semi-automatic Monthly capacity is 30 tons aluminum castings. Gravity die casting can make aluminum casting only.
CNC capacity: We have 43 sets CNC machines in our three foundries’ The maximum milling machine is 1500mm*800mm Hartford CNC; the maximum turning lath is 1200*800mm. Most of our machines are made in Taiwan, Japan, Korea and Germany, such as Dosan, Feeder, Gildemeiste, Wia, Mazak. Our machinists are with more than 10 years experiences in machining casting work.